A technician spills a toxic chemical. She isn’t injured but easily could have been. The hazmat cleanup costs more than $10,000 and shuts down a critical building for a week. An electrical engineer flips the wrong switch in a substation control room. He isn’t injured. But within seconds, a $50,000 transformer is destroyed.Three financial clerks in two different countries are processing payments for a large bank. They intend to schedule a routine $8 million payment. Antiquated software makes errors hard to catch. The clerks accidentally wind up sending $893 million instead.Talking about building a culture of safety and human reliability is