Loading...
This content is sponsored by NuFlow Technologies. Sponsored content is authorized by the client and does not necessarily reflect the views of COLE Publishing. View our privacy policy.
 

In this video from the Water & Wastewater Equipment, Treatment & Transport (WWETT) Show, staff from NuFlow Technologies demonstrates a Cold Cure UV 4-inch push/pull-in-place pipe lining.

“Timing-wise, the total cure is 10 minutes,” says a company spokesperson. “So your productivity is going to go through the roof. And again, this stuff tests out incredibly strongly.”

For more information, visit www.nuflow.com.

Xcavator 2020 Full Walkthrough
Next ›› Customer Feedback Drives the Many Features of the X-Cavator

Related